Texas Road House
- City/State
- Fayetteville, NC
- Trade
- Complete Sitework
- CSI divisions
- 02 Existing Conditions, 31 Earthwork, 32 Exterior Improvements, 33 Utilities
Complete sitework including demolition, earthwork, paving and utilities.
These cards are the published redacted takeoffs. Each one lists the project, city and state, trade, CSI divisions, and a one-line scope summary.
Client details are redacted and these files are shared with permission.
Complete sitework including demolition, earthwork, paving and utilities.
Complete sitework including demolition, earthwork, exterior improvements and utilities.
Erosion control including silt fence, filter fabric, posts and a construction drive.
Site and building concrete, paving and pavement markings, including footings, earthwork and exterior improvements.
Civil package including demolition, concrete foundations, earthwork, exterior improvements and underground utilities.
Building and site concrete including grade beams, reinforcement, formwork, excavation and backfill.
An editable workbook with quantities, units, and the sheet or detail each row came from. Earthwork stays split by bank, loose, or compacted measure. Pipe, structures, paving, and flatwork stay on their own lines so your rates can drop in.
When the proposal includes pricing, the same quantities are extended with the labor, equipment, material, and subcontract costs you supply. A quantity-only takeoff does not invent unit prices.
Measured areas, runs, and counts are marked on the civil sheets so a reviewer can see what was included. Markups are a check of the takeoff, not a design revision.
The sample takeoff viewer shows quantity excerpts already on this site: selected ground and exterior rows and underground utility rows, with original units and a cropped utility drawing. Those excerpts are a quantity schedule. They are not a complete project total, a priced bid, or a color-coded markup set.
Typical fees and the 24-48 hour delivery window are on the pricing page.
Upload your plans for a 24–48 hour estimate