State bid reference · AZ
Arizona: Use the active 2025 permit rather than an expired coverage assumption
ADEQ identifies the 2025 CGP as replacing the 2020 permit and provides active-permit lookup and myDEQ actions. It requires the SWPPP to be completed before the NOI and includes qualifying construction-support operations.
Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.
What this changes in the bid review
Estimating interpretation: Do not rely on an old permit number copied into a bid cover sheet. Reconcile current coverage, support areas and the SWPPP before assuming the temporary controls are completely defined.
Check the project documents
Clarification to request: Which active ADEQ coverage record and SWPPP include the proposed construction and support areas?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
ADEQ Construction Activity General Permit
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Local bid references with agency sources
- Maricopa: Drainage clearance and a separate floodplain review
- Pima: Floodplain review differs for single lots and commercial development
- Pinal: Preliminary and final drainage clearance are separate milestones
These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.