Florida: sitework estimating — bid and specification guide

For Florida bids, first separate FDOT contract quantities, construction-stormwater controls and any environmental-resource or dewatering scope. The estimating problem is establishing which approvals and details govern each work package, not assuming every Florida site has the same groundwater depth.

Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.

Bid decisions to resolve before pricing

1. Use the FDOT edition incorporated into the contract

Source context: The FDOT library lists fiscal-year specification editions, effective dates and revision histories. Read the agency resource.

Estimating application: Record the contract edition and revisions next to each highway pay item. For private parking and utility work, establish whether the designer actually incorporated FDOT requirements before using an FDOT measurement rule.

Clarification to request: Which fiscal-year edition and revisions appear in the governing proposal?

2. Keep construction CGP and other approvals distinct

Source context: Florida DEP explains that its Construction Generic Permit is separate from environmental-resource and local stormwater permits. Read the agency resource.

Estimating application: Use a permit responsibility matrix with an owner, status and estimating consequence for each approval. Quantify the approved drainage design; do not calculate a detention allowance solely from the disturbed acreage.

Clarification to request: Are the ERP conditions, local drainage review and approved stormwater details included in the bid set?

3. Price dewatering from a defined discharge route

Source context: DEP allows certain construction dewatering under CGP coverage when its criteria are met; other cases need separate coverage. Read the agency resource.

Estimating application: Ask for groundwater observations, excavation stages, discharge location and treatment requirements. Separate setup, duration, treatment and removal rather than embedding an unlimited pump allowance in pipe footage.

Clarification to request: Has the proposed discharge method been accepted, and what information supports the pumping duration?

Storm pipe beside a wet excavation

Illustrative estimating sequence; it does not assume a statewide water table or pump rate.

  1. Measure pipe, structures and trench geometry from the plans and profiles.
  2. Read the groundwater report and ask for the proposed discharge route.
  3. Carry dewatering and water treatment as identified scope pending the approved method and construction duration.

The pipe takeoff stays measurable while the unresolved dewatering exposure remains visible to the bidder.

Source documents and limits

Sources checked . The bid-review notes are our estimating interpretation of the linked resources. Confirm the contract edition, current amendments and project approvals before pricing.

A quantity takeoff records scope from supplied documents. It does not provide engineering design, a permit approval, a site investigation or an installation-ready machine-control model.

Documents needed for a Florida sitework takeoff

The project address establishes the review area, but the drawing set establishes the quantities. Put each of the following in a document register with its date, revision and author. Missing inputs should become a clarification or a stated allowance.

InputWhat it resolvesIf absent
Address, parcel and approving authoritySite limits, municipality, roadway and utility interfacesAsk the designer to confirm jurisdiction; a postal city is insufficient.
Existing survey and proposed gradingSurface comparison, stripping and earthwork boundariesIdentify the missing surface; do not report a balanced site from plan area alone.
Geotechnical report and approved detailsUndercut, material reuse, groundwater and conversion assumptionsUse a named, separate allowance pending design information; avoid county-wide soil factors.
Utility plans, profiles and sectionsPipe runs, depths, structures, bedding and restorationList missing inverts, dimensions and connection limits for clarification.
Stormwater plans, permits and phasingTemporary controls, permanent facilities, treatment and stabilizationSeparate measurable installations from unresolved operating duration and responsibilities.
Bid schedule, specifications and addendaPay units, incidental work, exclusions and revisionsKeep measured quantities separate from unconfirmed payment assumptions.

Use the interactive pre-bid checklist to record scope gaps. For workbook structure and published quantity excerpts, review the sample takeoffs.

Local bid references with agency sources

These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.

Choose the work package you need to measure

Use the technical service pages for measurement methods and inclusions. The local guide identifies document and jurisdiction questions; the work package defines the requested deliverable.

Send the drawings, revision list and intended bid scope for a project-specific proposal. Price, schedule and file deliverables are confirmed after document review.