CSI Divisions 31 • 32 • 33 Sitework Specialist

Sitework Estimating Services for Civil Contractors

Send your civil plans for itemized earthwork, underground utility and paving quantities across CSI Divisions 31, 32 and 33. Request a quantities-only takeoff for your own rates or a priced estimate with an agreed cost basis. Your written proposal confirms the scope, fee and delivery date before work starts.

View Civil Takeoff SamplesCall Estimating Desk
Scope First
Quantities or Agreed Pricing
CSI MasterFormat
Divisions 31, 32 & 33 Itemized
50 States
Remote US Contractor Support
31 / 32 / 33
Civil scope
Earthwork, exterior improvements and utilities.
52
Ground & exterior items
Selected published schedule rows, with original units.
26
Utility items
Pipe runs and structure counts in the utility excerpt.
By project
Scope & delivery
Fee, exclusions and deadline confirmed in your proposal.
Heavy civil earthmoving excavation and GPS bulldozer grading commercial development pad with elevation grade stakes
Illustrative sitework scene: High-Production GPS Bulk Earthmoving, Subgrade Compaction & Pad PreparationCSI DIVISION 31 • EARTHMOVING

Contact the Estimating Team

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Loading the drawing uploader…

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

For your next civil bid

Choose the sitework scope you need priced

Send the current civil drawing set, project location, available geotechnical report and bid deadline with its time zone. Include utility profiles, paving sections and all issued addenda.

Quantities for your rates

Request measured quantities, units, drawing references and separately identified allowances so your team can apply supplier quotations and production rates.

A priced sitework estimate

Identify the labor, equipment, materials and subcontract pricing you need. Confirm the cost basis, assumptions and revision coverage in the proposal.

Before work starts: agree the included trades, output formats, fee and delivery date. Specify heatmaps or native surface files separately.

Earthwork takeoff scope · Utility takeoff scope · Paving quantities

Interactive Bid Tool
Sitework Scope Configurator
CSI ALIGNED

Select your upcoming bid scope to preview required drawing sheets and standard deliverables:

Required Civil Drawing Sheets:
  • ✓Sheet C-101: Existing Topography & Tree Clearing Limits
  • ✓Sheet C-201: Existing vs. Proposed Grading & Surface Contours
  • ✓Sheet C-301: Storm Drainage Profiles, Inlets & Retention Details
  • ✓Sheet C-401: Pavement Schedule, Asphalt & Curb Details
  • ✓Geotechnical Soils Boring Log (for rock refusal & shrink/swell)
CSI Divisions 31, 32 & 33 Preconstruction OverviewUpdated for 2026 Civil Estimating Standards

What Are Professional Sitework Estimating Services?

Sitework estimating services measure earthwork, underground utilities and exterior improvements from issued civil drawings for contractor bid review. Quantities and units are kept separate from labor, equipment and material pricing. The proposal should identify the drawing issue, measurement basis, exclusions and requested output for Divisions 31, 32 and 33. Cut/fill surface models, heatmaps and machine-control files require separate scope and file-format confirmation; the published quantity excerpts do not demonstrate those model outputs.

Delivery Schedule
Confirmed in Quote
Scope and drawing review required
Measurement Basis
BCY / LCY / CCY
Geotechnical factors stated
CSI Specification
Divisions 31, 32, 33
Full civil site infrastructure
Core Deliverables
Quantity Schedules
Formats agreed in the proposal
MasterFormat Standard

Civil Sitework Scope Breakdown (Divisions 31 • 32 • 33)

Every quantity takeoff is organized by MasterFormat specifications to help identify bid-day omissions and match general contractor tender packages:

CSI Division & CodeQuantified Scope ElementsDeliverable Calculations
Division 31
Earthwork (31 10 00 / 31 20 00)
Site clearing & grubbing, topsoil stripping, rough site grading, cut-to-fill mass haul, building pad over-excavation, subgrade prep, and structural fill compaction.Gross Cut (BCY), Gross Fill (CCY), Topsoil Stripping & Respread (CY), Net Export/Import (LCY/CCY), 3D Cut/Fill Color Heatmap PDF.
Division 32
Exterior Improvements (32 12 00 / 32 13 00)
Asphalt paving (surface & binder courses), crushed aggregate subbase, concrete curb & gutter, sidewalks, valley gutters, dumpster pads, and landscaping where specified.Asphalt Surface/Binder (SY), Aggregate Base (TN / CY), Curbs & Gutters (LF), Flatwork (SF), Silt Fence & Inlet Protection (LF / EA).
Division 33
Utilities (33 10 00 / 33 30 00 / 33 40 00)
Storm sewer systems, precast manholes & catch basins, retention/detention ponds, underground chambers, sanitary sewer mains & laterals, domestic/fire waterlines, valves & hydrants.Pipe Length by Diameter & Material (LF), Bid Depth Brackets (0-6', 6-10', 10-14', 14'+), Trench Excavation (BCY), Bedding & Backfill (TN/CY), Structures (EA).
The Contractor's Reality

The True Cost of an Inaccurate Earthwork Takeoff

In civil and sitework construction, the ground holds the highest financial risk. A simple 3,000 CY calculation discrepancy on export trucking can wipe out an entire subcontractor's profit margin before foundation work even begins.

Dirt Imbalance & Trucking Costs

Assuming a balanced site when 4,500 CY of export is required means unexpected trucking, disposal tipping fees, and machine idle time. We model cut/fill down to the exact subgrade offset.

Underground Utility Scope Gaps

Missing trench depth stratification (0-6', 6-10', 10'+), rock excavation strata, or granular bedding requirements leads to under-bidding high-risk storm and sanitary installations.

Bid Crunch & High Software Overhead

Outsourcing a defined takeoff scope can support contractors during busy bid periods. Confirm capacity, file requirements and delivery dates for each project.

Specialized Capabilities

Comprehensive Sitework Takeoff Services

Built strictly around CSI MasterFormat specifications to seamlessly integrate with your bidding spreadsheets, unit-rate databases, and subcontractor proposals.

CSI DIVISION 31High Demand

3D Earthwork Cut & Fill Takeoffs

Comprehensive 3D surface modeling comparing existing topographical survey contours against finished civil design elevations. We account for topsoil stripping, subgrade section depths, building pads, and retention ponds.

  • Cut/Fill Summary: Gross Cut, Gross Fill, Topsoil Stripping & Respread
  • Color Heatmaps: Visual cut/fill depth mapping for site superintendents
  • Mass Haul Analysis: Net export/import volumes & internal haul balancing
CSI DIVISION 33Civil Infrastructure

Underground Site Utility Estimating

Itemized quantification of wet and dry utilities. Every pipe run is measured with invert elevations, depth brackets, trench excavation, bedding stone, and backfill volumes.

  • Storm Drainage: RCP, HDPE, PVC pipe LF, curb inlets, catch basins & headwalls
  • Sanitary Sewer: SDR-35 / PVC lines, precast manholes, drop connections & laterals
  • Water Systems: C900 / DIP mains, fire hydrants, gate valves, tees & services
CSI DIVISION 32Exterior Paving

Grading, Paving & Exterior Hardscape

Accurate area and volume takeoffs for heavy-duty vs. light-duty pavement sections, subbase gravels, concrete flatwork, curbs, and perimeter erosion controls.

  • Asphalt & Base: Surface course SY, binder course SY, crushed stone base TN
  • Concrete Work: Standard & ribbon curbs LF, valley gutters, 4"-6" sidewalks SF
  • Erosion Control: Silt fence LF, stabilized construction entrance, inlet protection
BID PACKAGINGGC & Sub Ready

Civil Subcontractor Bid Preparation

Turn raw quantity takeoffs into clean, line-item bid proposals. We populate your custom unit costs or provide clear quantity schedules formatted to your general contractor's bid forms.

  • Bid Form Alignment: Itemization mapped directly to Owner / GC bid schedules
  • Scope Gap Analysis: Flagging conflicts between civil plans, specs & soils report
  • Excel Integration: Dynamic formulas for labor, equipment & material rate changes
Scope Directory

All 8 Commercial Sitework Estimating Disciplines

View Full Services Directory →
● Site Demolition & Clearing● 3D Earthwork Cut & Fill● Underground Site Utilities● Stormwater & Detention Ponds● Site Grading & Asphalt Paving● Concrete Curbs & Flatwork● Erosion Control & SWPPP● Subcontractor Bid Packaging
Simple & Reliable Process

From Civil Blueprints to Bid-Ready Quantities

Our estimating workflow reviews the issued elevations, pipe inverts and paving layers, and records unresolved drawing conflicts for your project team before bid review.

1

Submit Civil Plans

Upload your PDF drawings, CAD/LandXML files, and geotechnical boring logs via our portal with your bid deadline.

2

Scope Review & Quote

Our civil estimators review your drawing sheets, confirm the exact sitework scope (Divisions 31, 32, 33), and provide an upfront proposal.

3

3D Surface Modeling

We digitize existing topography and proposed finished design grades, calculating cut/fill, subgrade offsets, and utility trenches.

4

Senior QC & Delivery

A senior estimator audits the quantities for common errors and delivers full 3D color heatmaps, marked-up plans, and editable Excel files.

Explore Our 4-Step Takeoff Methodology →
Document-led Bid Review

State Bid References and Scope Questions

Use sourced references to identify the governing documents and scope boundaries. Project investigation and approved plans establish the actual site conditions:

TEXAS

Contract Items & SWP3

Separate TxDOT contract items, local drainage interfaces and construction-stormwater responsibilities.

Read the Texas bid reference →
FLORIDA

Dewatering & Permit Interfaces

Check the project discharge method, construction-stormwater coverage and environmental-resource approvals.

Read the Florida bid reference →
NEW YORK

Letting Dates & Utility Scope

Reconcile specification dates and measurement units, then identify the local sewer or outfall connection requirements.

Read the New York bid reference →
CALIFORNIA

Standards & Stormwater Documents

Record the standards incorporated into the contract and measure the project-specific grading and stormwater details.

Read the California bid reference →
Before you outsource

Agree the sitework scope, measurement basis and handoff

A usable civil estimate separates measured quantities from contractor pricing and from any engineering or field-model deliverables. Use the proposal to define what is included.

Quantity takeoff or priced estimate?

Confirm whether you need measured quantities only or labor, equipment, materials and subcontract costs. Supply your production assumptions, local vendor rates, haul routes and disposal requirements for any priced scope.

Files and revisions

Specify the spreadsheet layout, drawing markups, required surface files, baseline issue and addenda. Confirm any special software or GPS export requirement before authorizing work; public quantity excerpts do not demonstrate a machine-control package.

Project-specific fee and delivery

The proposal should state the fee, included trades, exclusions, delivery date and revision terms after the drawings are reviewed. Include acreage, project location and the bid deadline with its time zone.

Review before bidding

Check plan references, units, allowances, cut/fill basis and missing design information. Keep rock, unsuitable soil, dewatering, temporary works, haul/disposal and testing allowances visible rather than hiding them in a single quantity.

Prepare your civil drawing set · Review a takeoff · Inspect actual quantity excerpts

Frequently Asked Sitework Estimating Questions

What is included in a professional sitework takeoff?

The agreed scope may cover clearing and excavation, grading, paving and concrete flatwork, plus underground water, sewer and storm drainage quantities. Deliverables identify measurements, units, plan references, allowances and exclusions so the contractor can review and price the work.

How much do sitework estimating services cost?

Fees depend on the drawing set, acreage, utility profiles, requested trades, revisions and deliverable formats. Submit the plans and bid deadline for a project-specific scope and fee proposal before work begins.

How quickly can an earthwork takeoff be delivered?

The delivery date is confirmed after reviewing the plans, scope, available information and current workload. Include your bid date and time zone when requesting a quote. Ask whether any expedited schedule is available for your project.

What files should I expect with a civil takeoff?

The published samples demonstrate itemized quantity schedules and a cropped civil drawing preview. Confirm editable spreadsheet formats, PDF markups and any requested surface-model exports in the proposal. A quantity takeoff is separate from a field-ready machine-control model or engineering design.

How are soil cut and fill volumes calculated?

Existing ground is compared with the proposed excavation or subgrade surface inside defined boundaries. Pavement and slab depths, stripping, unsuitable material and phased work are treated separately. Bank, loose and compacted volumes are identified, with project geotechnical factors stated rather than assumed to be interchangeable.

Why do subgrade deductions and soil factors matter?

Finished pavement elevations differ from earthwork subgrade elevations. As an illustrative geometry check, a one-foot section across 100,000 square feet represents 100,000 divided by 27, or about 3,704 cubic yards. Actual shrink, swell and reuse factors must come from the project information and be identified in the takeoff.

Which civil plan sheets are needed for a quote?

Provide the current civil drawing set, existing survey and grading plans, utility plans and profiles, pavement and structure details, specifications, available geotechnical report and all addenda. Sheet numbering varies by designer; identify the revision date and scopes you need priced.

How should revisions and scope discrepancies be handled?

Record the baseline drawing revision and addenda used for the takeoff. Compare changed limits, elevations, utility runs and details against that baseline. Confirm the revision scope and delivery date, and keep unresolved conflicts visible as assumptions or questions for the project team.

Hard Bid Deadline Approaching?

Submit Your Drawing Set for a Scoped Sitework Proposal

Upload civil drawings via link or direct form. Our senior estimators review plans, identify potential scope gaps, and issue a project-specific takeoff proposal.

Call Estimating DeskCall Estimating Desk