York, ME: Saco drainage hierarchy and erosion-control inputs
Saco’s published MS4 plan describes minimizing impervious area and onsite retention/detention before reliance on municipal storm discharge, and includes erosion-control, inspection and housekeeping references. Confirm the current city requirements for the specific development.
Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.
What this changes in the bid review
Estimating interpretation: For a Saco project, a proposed pipe to the street should not be treated as an accepted drainage solution without its approval. Quantify the actual onsite controls and approved outfall rather than substituting a simpler assumed connection.
Check the project documents
Clarification to request: Which approved onsite controls and runoff destination establish the Saco stormwater scope?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
Saco MS4 Stormwater Plan published by Maine DEP
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.