Local bid reference

Dane, WI: Farmstead disturbance and cumulative impervious area

Dane County’s agricultural permitting guidance distinguishes land-disturbance review from cumulative added impervious area. Its stormwater discussion counts qualifying additions over time, rather than only the newest farmstead addition.

Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.

What this changes in the bid review

Estimating interpretation: A small new paved area can be part of a larger cumulative development record. Keep that history in the design-input request so drainage review is not based solely on the latest sheet’s area label.

Check the project documents

Mark each item after reviewing its supporting document.

Clarification to request: What prior impervious additions are included in the county’s cumulative-area review for this farmstead?

0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.

Official context

Dane County Agricultural Erosion and Stormwater Permitting

Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.

Related state and measurement references

Open the Wisconsin document reference for state-level resources. For measurement methods, use the utility trench guide or civil-plan reading guide.