King, WA: Legacy SWDM pages explicitly point to the 2026 manual
King's legacy 2021/2024 manual page identifies the 2026 SWDM as current and notes construction-start conditions affecting older permitted projects.
Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.
What this changes in the bid review
Estimating interpretation: Do not reuse an older permitted design solely because it remains online. Resolve transition applicability and retain the accepted treatment detail and media specification with the takeoff.
Check the project documents
Clarification to request: Does this older permit need a standards update before construction starts?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
King County: Surface Water Design Manual version notice
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Related state and measurement references
Open the Washington document reference for state-level resources. For measurement methods, use the utility trench guide or civil-plan reading guide.