| Address, parcel and approving authority | Site limits, municipality, roadway and utility interfaces | Ask the designer to confirm jurisdiction; a postal city is insufficient. |
|---|
| Existing survey and proposed grading | Surface comparison, stripping and earthwork boundaries | Identify the missing surface; do not report a balanced site from plan area alone. |
|---|
| Geotechnical report and approved details | Undercut, material reuse, groundwater and conversion assumptions | Use a named, separate allowance pending design information; avoid county-wide soil factors. |
|---|
| Utility plans, profiles and sections | Pipe runs, depths, structures, bedding and restoration | List missing inverts, dimensions and connection limits for clarification. |
|---|
| Stormwater plans, permits and phasing | Temporary controls, permanent facilities, treatment and stabilization | Separate measurable installations from unresolved operating duration and responsibilities. |
|---|
| Bid schedule, specifications and addenda | Pay units, incidental work, exclusions and revisions | Keep measured quantities separate from unconfirmed payment assumptions. |
|---|