Local bid reference

Horry, SC: Resolve conflicting disturbance thresholds before scope closure

Horry's permitting page contains differing disturbance-threshold statements in its overview and basic-criteria sections; project applicability should be confirmed with the county.

Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.

What this changes in the bid review

Estimating interpretation: Do not select the more convenient threshold or infer an exemption. Keep permit status unresolved until clarified, while measuring the shown controls and permanent facilities separately.

Check the project documents

Mark each item after reviewing its supporting document.

Clarification to request: Which current disturbance criterion and exemptions apply to this specific project?

0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.

Official context

Horry County: Storm Water Permitting

Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.

Related state and measurement references

Open the South Carolina document reference for state-level resources. For measurement methods, use the utility trench guide or civil-plan reading guide.