Philadelphia, PA: sitework bid and jurisdiction guide

Philadelphia sitework estimating should start with the PWD review classification and accepted stormwater design. Earth disturbance, development type and the selected practice affect the scope documents; they do not justify copying a generic Pennsylvania detention allowance.

Jurisdiction boundary: Philadelphia Water Department development review; confirm the project classification and applicable state coverage.

Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.

Bid decisions to resolve before pricing

1. Establish development classification and plan revision

Source context: The PWD manual organizes applicability, submission and design guidance for development and stormwater projects. Read the agency resource.

Estimating application: Record the accepted classification, earth-disturbance limit and manual revision with the civil cover sheet. Ask the designer to resolve applicability instead of treating every redevelopment as the same stormwater package.

Clarification to request: What PWD review classification and accepted plan set establish the work in this bid?

2. Take off the chosen stormwater practice and supporting components

Source context: PWD guidance includes practice design alongside pretreatment, inlets, outlets and supporting features. Read the agency resource.

Estimating application: Trace excavation, storage, soil or aggregate media, underdrains, pretreatment and overflow individually. Compare component elevations against grading before pricing.

Clarification to request: Are maintenance access, pretreatment and outlet controls included or assigned to another trade?

3. Keep municipal stormwater and construction-stage responsibilities distinct

Source context: PWD maintains local stormwater regulations; state Chapter 102 documentation is a separate project review input. Read the agency resource.

Estimating application: Compare the PWD accepted design with construction-stage E&S plans. Flag duplicate basin excavation, missing conversion work or conflicting limits and obtain a written scope assignment.

Clarification to request: Does the construction-stage plan agree with the final PWD-approved system and restoration limit?

An underground facility sits below proposed paving

Illustrative Philadelphia quantity review; no universal required storage volume is assumed.

  1. Measure the facility excavation using the designed footprint and elevations.
  2. Separate aggregate envelope, storage components and utility connections.
  3. Reconcile paving restoration with the facility work to avoid measuring the same pavement twice.

Facility installation and surface completion remain traceable in separate workbook rows.

Source documents and limits

Sources checked . The bid-review notes are our estimating interpretation of the linked resources. Confirm the contract edition, current amendments and project approvals before pricing.

A quantity takeoff records scope from supplied documents. It does not provide engineering design, a permit approval, a site investigation or an installation-ready machine-control model.

Documents needed for a Philadelphia, PA sitework takeoff

The project address establishes the review area, but the drawing set establishes the quantities. Put each of the following in a document register with its date, revision and author. Missing inputs should become a clarification or a stated allowance.

InputWhat it resolvesIf absent
Address, parcel and approving authoritySite limits, municipality, roadway and utility interfacesAsk the designer to confirm jurisdiction; a postal city is insufficient.
Existing survey and proposed gradingSurface comparison, stripping and earthwork boundariesIdentify the missing surface; do not report a balanced site from plan area alone.
Geotechnical report and approved detailsUndercut, material reuse, groundwater and conversion assumptionsUse a named, separate allowance pending design information; avoid county-wide soil factors.
Utility plans, profiles and sectionsPipe runs, depths, structures, bedding and restorationList missing inverts, dimensions and connection limits for clarification.
Stormwater plans, permits and phasingTemporary controls, permanent facilities, treatment and stabilizationSeparate measurable installations from unresolved operating duration and responsibilities.
Bid schedule, specifications and addendaPay units, incidental work, exclusions and revisionsKeep measured quantities separate from unconfirmed payment assumptions.

Use the interactive pre-bid checklist to record scope gaps. For workbook structure and published quantity excerpts, review the sample takeoffs.

Related state and measurement references

Open the Pennsylvania document reference for state-level resources. For measurement methods, use the utility trench guide or civil-plan reading guide.

Choose the work package you need to measure

Use the technical service pages for measurement methods and inclusions. The local guide identifies document and jurisdiction questions; the work package defines the requested deliverable.

Send the drawings, revision list and intended bid scope for a project-specific proposal. Price, schedule and file deliverables are confirmed after document review.

Request a scoped takeoff quote