State bid reference · OK
Oklahoma: OKR10 site descriptions include off-site support and peak disturbance
The OKR10 SWP3 site-description provisions address total disturbance, maximum area disturbed at one time, on/off-site support activities and impervious-area information. These describe different project measures.
Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.
What this changes in the bid review
Estimating interpretation: A phased job should not use its smallest active phase as the entire project footprint. Preserve both total and concurrent disturbance in the register and quantify controls for the actual sequence.
Check the project documents
Clarification to request: What total, concurrent and off-site support disturbance assumptions are incorporated into the SWP3?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
Oklahoma DEQ OKR10 General Permit
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Local bid references with agency sources
- Oklahoma: Land-use review and floodplain cases in Oklahoma County
- Tulsa: County utility and driveway interfaces near levee systems
- Cleveland: Norman floodplain approval and elevation closeout
These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.