Local bid reference

Queens, NY: DEP sewer certification versus authorization to connect

NYC DEP distinguishes House/Site Connection Proposals used for sewer certification from the later sewer connection permit authorizing the work. Proposal type depends on development characteristics, not simply the borough.

Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.

What this changes in the bid review

Estimating interpretation: A certified proposal is a design-review milestone; it should not be described as permission to perform the connection. Keep that distinction in the bid-input register while measuring the approved pipe and structure details.

Check the project documents

Mark each item after reviewing its supporting document.

Clarification to request: Has the connection permit been issued for the same proposal revision used in this takeoff?

0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.

Official context

NYC DEP Sewer Connections

Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.

Related state and measurement references

Open the New York document reference for state-level resources. For measurement methods, use the utility trench guide or civil-plan reading guide.