State bid reference · MN

Minnesota: Infiltration eligibility must be established before measuring the practice

MPCA’s manual identifies construction-permit prohibitions on infiltration in certain conditions, including fueling/maintenance drainage and contamination risks. Infiltration is not a universally acceptable replacement for a designed treatment practice.

Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.

What this changes in the bid review

Estimating interpretation: A quantity reviewer should not change a lined treatment system to infiltration to simplify a bid. Hold the approved configuration and request clarification where source-area use or investigation data conflicts with the detail.

Check the project documents

Mark each item after reviewing its supporting document.

Clarification to request: What documented eligibility and site investigation support the selected infiltration or non-infiltration practice?

0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.

Official context

MPCA Minnesota Stormwater Manual Infiltration Limits

Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.

Local bid references with agency sources

These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.