Minnesota: Infiltration eligibility must be established before measuring the practice
MPCA’s manual identifies construction-permit prohibitions on infiltration in certain conditions, including fueling/maintenance drainage and contamination risks. Infiltration is not a universally acceptable replacement for a designed treatment practice.
Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.
What this changes in the bid review
Estimating interpretation: A quantity reviewer should not change a lined treatment system to infiltration to simplify a bid. Hold the approved configuration and request clarification where source-area use or investigation data conflicts with the detail.
Check the project documents
Clarification to request: What documented eligibility and site investigation support the selected infiltration or non-infiltration practice?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
MPCA Minnesota Stormwater Manual Infiltration Limits
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Local bid references with agency sources
- Hennepin: County-road water quality obligations
- Ramsey: Saint Paul sewer records and street-work permits
- Dakota: County-highway construction, obstruction and utility permits
These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.