State bid reference · MA

Massachusetts: Dewatering and remediation coverage depends on the discharge activity

EPA’s DRGP for Massachusetts addresses site remediation, site dewatering, infrastructure dewatering/remediation and material dewatering. Its scope includes certain construction dewatering activities; applicability must be checked against the actual discharge.

Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.

What this changes in the bid review

Estimating interpretation: Do not select a generic pump allowance without the discharge basis. A remediation stream, a small construction excavation and material dewatering can require different controls even on the same property.

Check the project documents

Mark each item after reviewing its supporting document.

Clarification to request: Which authorized discharge category and treatment conditions govern the temporary dewatering scope?

0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.

Official context

EPA Dewatering and Remediation General Permit

Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.

Local bid references with agency sources

These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.