Indiana: Local MS4 review does not replace the IDEM NOI
IDEM states that qualifying projects need a CSGP NOI whether inside or outside an MS4. IDEM recognizes qualifying local review but does not delegate CSGP administration to the MS4. The CSGP replaced the former Rule 5 program.
Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.
What this changes in the bid review
Estimating interpretation: Local approval and state coverage should be separately traceable. A drawing marked Rule 5 or locally approved needs its current program documents checked before treating all stormwater responsibilities as resolved.
Check the project documents
Clarification to request: Are both current IDEM coverage and the applicable local review complete for the same construction scope?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
IDEM Construction NOI Submittal
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Local bid references with agency sources
- Marion: Drainage review does not remove floodplain review
- Lake: Legal drains and subdivision review in Lake County
- Allen: Allen County regulated drains are not only open ditches
- Hamilton: Crossing, outletting to or working beside a regulated drain
These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.