State bid reference · ID
Idaho: Current IPDES coverage and construction inspections
Idaho DEQ directs construction-stormwater applications to its IPDES e-permitting system and describes periodic inspections by people knowledgeable in erosion control and pollution prevention. The program transferred from EPA to DEQ.
Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.
What this changes in the bid review
Estimating interpretation: Keep permit ownership and inspection responsibility with the temporary-control quantities. A takeoff lists installations; the bid still needs an assigned inspection and maintenance scope through stabilization.
Check the project documents
Clarification to request: Which current IPDES record and inspection responsibility apply to the construction phase?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Local bid references with agency sources
- Ada: ACHD public-right-of-way drainage interface
- Canyon: Floodplain map changes and permit documentation
- Kootenai: Subdivision disturbance and separate water-quality agencies
These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.