State bid reference · DE
Delaware: Delegated review, construction inspection and maintenance inspection
DNREC identifies delegated agencies with geographic responsibilities for sediment/stormwater plan review, construction inspection and maintenance inspection. The responsible agency can differ with the project location and program element.
Sitework Estimate provides remote, plan-based quantity takeoff support. This page does not establish a local office, completed local project, engineering approval or permit coverage.
What this changes in the bid review
Estimating interpretation: Follow the delegation through the whole project rather than stopping at the plan-review stamp. Installation, inspection access and handover records should each be assigned without assuming DNREC performs every local review.
Check the project documents
Clarification to request: Which delegated agency reviews, inspects and accepts this project’s stormwater facilities?
0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.
Official context
DNREC Sediment and Stormwater Delegated Agencies
Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.
Local bid references with agency sources
- New Castle: Unified Development Code and drainage treatment
- Sussex: Delegated sediment and stormwater review
These references address the named jurisdiction. Other municipalities can use different criteria and approval routes.