San Diego, CA: Post-construction BMP design is distinct from construction controls

San Diego County says its BMP Design Manual focuses on project design and post-construction requirements, not the construction process, and provides applicability guidance for projects in progress.

Remote plan-based takeoff support; no local office, completed local project or site investigation is represented by this page. Cost, delivery schedule and deliverables depend on the agreed project scope.

What this changes in the bid review

Estimating interpretation: Do not price permanent water-quality practices as temporary BMP maintenance. Keep installation, construction protection and final facility activation or turnover in separate scope groups.

Check the project documents

Mark each item after reviewing its supporting document.

Clarification to request: Which construction controls protect the permanent BMP before final activation?

0 of 3 checks reviewed. Notes stay in this tab; download to keep a copy.

Official context

San Diego County: BMP Design Manual

Source checked . Confirm the current incorporated edition and project approval with the named authority. The checks above are our estimating interpretation; the linked agency supplies the source context.

Related state and measurement references

Open the California document reference for state-level resources. For measurement methods, use the utility trench guide or civil-plan reading guide.